A useful RFQ lets suppliers quote the same construction and scope. Use this checklist with your approved project specification; it is not a design certificate or test report. Material and construction schedule Electrode type: GI tube, electrolytic copper tube, solid copper or copper-bonded steel. Model, diameter, length, wall thickness or copper-coating thickness, terminal and coupling details. Electrode, backfill, conductor, chamber and connection accessory quantities. Required model-specific datasheets, material declarations and relevant test reports. Scope and site information Project address, layout, panel/equipment schedule and conductor routes. Soil-resistivity data, existing pit test records and approved acceptance criteria. Supply-only or installation scope; trenching, reinstatement, access and unloading responsibilities. Separate prices for material, freight, civil work, installation and testing. Delivery or execution date, inspection requirements and quotation exclusions. Handover documents Specify as-built locations, pit identification, test-link details, measured results, test method, instrument identification and maintenance requirements in the agreed scope. Download the RFQ checklist