ONGC Lightning Protection addresses department-specific lightning protection, earthing and surge protection requirements for public buildings, utilities, control systems and project infrastructure. It is structured around tender submissions, BOQ review, installation quality, testing and handover.
Purpose and Scope
A complete lightning protection solution combines strike interception, controlled current conduction, earth termination, equipotential bonding and coordinated surge protection. Each element must be designed as part of one system. A low earth-resistance value alone does not prove complete lightning protection performance.
Engineering Inputs
Structure dimensions, height, roof geometry, electrical SLD, incoming services, rooftop equipment, soil data, occupancy and consequence of failure.
Design Deliverables
Risk assessment, roof plan, elevations, protection zones, down-conductor layout, earthing layout, SPD schedule and BOQ.
Installation Controls
Direct conductor routes, smooth bends, compatible metals, secure supports, test joints, waterproofing coordination and accessible inspection points.
Testing and Handover
Visual inspection, continuity, earth tests, SPD checks, photographs, as-built drawings, warranty and O&M documents.
Government Tender Submission Requirements
- Compliance statement against tender clauses
- Design basis and applicable standard
- Protected-zone drawings and BOQ
- Material datasheets and test documents
- Method statement and inspection test plan
- Commissioning reports and as-built drawings
Commercial and Technical Keywords
Typical BOQ Framework
| System Group | Typical Scope | Review Requirement |
|---|---|---|
| Air Termination | Rods, mesh conductors, masts, bases and supports | Coverage verification and fixing details |
| Down Conductors | Conductors, clamps, test joints and guards | Route, spacing, accessibility and protection |
| Earthing & Bonding | Electrodes, ring/grid, earth bars, pits and bonds | Continuity, corrosion compatibility and test access |
| Surge Protection | Power, data, telecom and control SPDs | Voltage, current rating, coordination and lead length |
| Documentation | Calculations, drawings, datasheets, ITP and test reports | Revision control and traceability |
Inspection and Maintenance
Periodic inspection should review air-terminal position, conductor continuity, loose or corroded joints, test-link access, earth-pit condition and SPD indicators. Any rooftop modification, electrical upgrade or new communication equipment should trigger a design review.
Frequently Asked Questions
Can the final quantity be calculated without drawings?
Only a provisional quantity can be estimated. Final quantities should follow approved plans, elevations and actual conductor routes.
Is one earth pit sufficient for every project?
No universal answer is possible. Soil conditions, geometry, bonding and the complete earthing arrangement determine the final solution.
Does a lightning protection system require SPDs?
Where electrical, electronic, data or communication systems are exposed to conducted or induced surges, coordinated SPDs are an important part of the protection strategy.