← Batch 9Standards Hub

SPD Coordination — Maintenance Guide

SPD Coordination — Maintenance Guide: practical lightning protection, earthing, SPD, design, tender and compliance guide.

SPD Coordination — Maintenance Guide provides practical orientation for engineers and tender users. It is not a replacement for the current official standard.

Scope and Purpose

Verify the current edition, amendments, national adoption and contract requirements before applying any design assumption.

Design Use

Risk inputs, geometry, earthing, bonding and SPDs.

Tender Use

Compliance clauses, BOQ, drawings and tests.

Inspection Use

Visual checks, continuity, earth tests and records.

Maintenance Use

Periodic review and modification control.

Compliance Workflow

  1. Confirm the current official edition.
  2. Identify applicable parts.
  3. Record design assumptions.
  4. Show requirements on drawings and BOQ.
  5. Inspect concealed work.
  6. Complete testing and as-built documentation.

Keywords

SPD CoordinationMaintenance Guidelightning protection standardtender complianceinspection requirements

Documentation

DocumentPurposeReview
Design BasisStandard, edition and assumptionsApprove before design
CalculationsRisk and design decisionsTraceable inputs
DrawingsLPS, earthing and SPDsCoordinated
TestsInspection and commissioningTraceable records
As-BuiltMaintenance referenceComplete before handover

Important Limitation

This page summarises workflow only and does not reproduce the standard.

FAQs

Which edition should be used?

Use the edition adopted by the contract or authority and verify amendments.

Can a tender mention only the standard number?

A strong tender should also define scope, quantities, tests and acceptance criteria.

Related Standards

Compliance Review

Share tender clauses and drawings for project-specific review.