SN Engineering β€’ Lightning Protection Design Decision SystemCustomer enters project β†’ SN recommends β†’ customer compares designs
SN ENGINEERINGLightning Protection Engineering Studio
01 β€’ Project Design Project Inputs Building dimensions, use, roof type, rooftop projections and project conditions.
02 β€’ Risk Assessment IEC 62305-2 Inputs Risk-data collection and current assessment status before final design selection.
03 β€’ Design Method Protection Method Rolling Sphere, Mesh or Protective Angle based on the current design criteria.
04 β€’ Output Design & Tender Output 3D visualization, preliminary BOQ, tender estimate and final project submission.
LIGHTNING PROTECTION DESIGN & TENDER PLANNING

Lightning Protection System Design, Installation & BOQ β€” Delhi NCR and India

IEC 62305 Risk Assessment β€’ Rolling Sphere β€’ Mesh β€’ Protective Angle β€’ BOQ β€’ Tender Planning

START PROJECT DESIGN
Step 1Enter Project Details
Step 2IEC 62305-2 Risk Inputs
Step 3Applicable Design Criteria & Method Comparison
Step 4Preliminary BOQ / Tender Estimate
FOR TENDER & PROJECT SPECIFICATION

Contact Technical Solution Provider: SN ENGINEERING

Lightning Protection Design β€’ Risk Assessment β€’ Technical BOQ β€’ Air-Termination System β€’ Down Conductors β€’ Earthing β€’ Equipotential Bonding β€’ Surge Protection β€’ Drawings & Technical Support

For full & final design, verified quantities and project-specific engineering confirmation: Team SN Engineering
Contact for Full & Final Design β†’
STEP 1 + 2

Enter Project Details β€” Build a Preliminary Design Preview

Enter the project geometry and roof conditions first. The visual model and preliminary method view use the selected design criteria. Final design criteria remain subject to the IEC 62305-2 risk assessment, complete project information and engineering review.

Applicable / Preferred design view
Air-termination conductorAir rod / candidate rodDown conductorEarth terminationProtected-volume indication
Viewing DesignRolling Sphere
Sphere Radius60 m
Mesh Reference20Γ—20 m
Down-Conductor Planning5 min.
Vertical Air RodsDrawing required
Preliminary Design Method as per Current Criteria

Rolling Sphere Method

Why this method is shownβ€”
Where this method is suitableβ€”
Project conditionβ€”
Engineering limitationFinal positions require actual roof drawing and project review.
STEP 4B

IEC 62305-2 Risk Assessment & Protection Requirement

The risk-management step comes before finalizing the protection measures and LPS design. Building geometry/use are taken from the project inputs; complete the remaining risk information here. Until the required inputs are reviewed, the website shows a preliminary design estimate only.

Engineering sequence: Project Inputs β†’ IEC 62305-2 Risk Assessment β†’ Applicable Protection Measures / LPS Design Criteria β†’ IEC 62305-3 Physical LPS Design β†’ IEC 62305-4 internal/SPD review as applicable.

Risk Assessment Input Status

Enter the missing details in this section. After submission the project status changes to Ready for SN Engineering Risk Review.

Building geometryAvailable from design
Building useAvailable from design
Project location / lightning exposureRequired
Occupancy / consequencesRequired
Incoming servicesRequired
Existing protection measuresRequired
Fire / special hazardRequired if applicable
SPD / bonding statusRequired
Risk Assessment Pending. Fill and submit the details below.

Complete Risk Assessment Inputs

These details are stored with the project. After submission, the project can be reviewed for the final IEC 62305-2 risk analysis and applicable protection measures by Team SN Engineering.

Generated Project Risk Note

STEP 3

Compare Applicable Air-Termination Design Methods

Use the same building to compare Rolling Sphere, Mesh and Protective Angle arrangements. The visual, preliminary quantities and explanations change together. Applicability depends on the structure geometry, selected LPS class and the applicable IEC / IS / NBC design criteria.

Applicable / Preferred

Rolling Sphere

Whole-building strike-point and protected-volume evaluation.

SN rough air-terminal recommendationβ€”β€”
Alternative

Mesh Method

Roof conductor network using the selected LPS mesh reference. Mesh intersections are not automatic rod locations.

SN rough air-terminal recommendationβ€”β€”
Alternative

Protective Angle

Local air-terminal protection where geometry and applicable height limits permit.

SN rough air-terminal recommendationβ€”β€”
ComparisonRolling SphereMeshProtective Angle
Primary design conceptChecks exposed strike points around 3D geometryRoof conductor networkProtective zone around an air terminal
Complex roof / HVAC / PVStrong fitMay need additional rods / detailed checksLocal use only where applicable
Simple flat roofApplicableStrong fit where mesh arrangement is selectedCan be suitable for local points
Vertical rodsPlaced only where protected-volume design requiresNot automatically at mesh intersectionsMethod depends on selected rod geometry
Customer visibilityVery clear 3D protection conceptVery clear conductor layoutEasy for simple local geometry
Main limitationNeeds actual 3D geometryDoes not by itself solve all protrusion/clearance issuesNot suitable as a universal whole-building shortcut
STEP 4A

Preliminary Quantity Estimate β€” Based on Your Inputs

Even if no drawing is uploaded, the system provides preliminary planning quantities from the entered dimensions, building use, rooftop condition, selected LPS class and stated calculation assumptions. These quantities are for budgeting, tender preparation and initial project planning only.

ProjectIndustrial / Factory
Building30 Γ— 20 Γ— 8 m
LPS ClassLPS IV
Recommendation BasisNo drawing β€” input-based preliminary design
This is an input-based online preliminary estimate. SN Engineering is recommending provisional quantities so the customer can understand the likely system and budget scope before a drawing is available. These quantities are not represented as final construction quantities.
Applicable / Preferred System ItemPreliminary Estimated QuantityBasis / Assumption
Not Final β€” Full & Final Confirmation: These quantities are intended only for budgeting, tender preparation and initial project planning. For final air-terminal positions, conductor routing, down conductors, earth termination, accessories, verified BOQ, drawings and project-specific risk/design confirmation, contact Team SN Engineering and share the roof drawing / architectural layout / SLD where available.
Preliminary Estimate Disclaimer
This is not a final construction BOQ. Quantities are generated from user-entered information and planning assumptions to help with tendering, budgeting and project estimation. For full & final design, verified BOQ, approved drawings, risk analysis and site-specific technical confirmation, please contact Team SN Engineering.
Show How SN Engineering Estimated These Quantities
ENGINEERING TRANSPARENCY

How It Is Calculated / Applicable Standard & Guideline Basis

LPS Class

Mesh Conductor

Vertical Air Terminals

Down Conductors

Earth Termination

Accessories

FULL & FINAL ENGINEERING

Submit Project for Full & Final Design

Submit the current project inputs, selected method view, preliminary BOQ and risk-input status to Team SN Engineering for full & final design, verified quantities and technical confirmation.

FOR TENDER & PROJECT SPECIFICATION

Contact Technical Solution Provider: SN ENGINEERING

Use the online tool for preliminary project calculation and tender estimation. For final risk analysis, verified LPS layout, BOQ confirmation, drawings, product/technical selection and execution support, contact Team SN Engineering.

Submit Project to Team SN Engineering β†’
AI-ASSISTED TECHNICAL CONTENT WORKFLOW

SN Engineering AI Knowledge Engine

Use AI to identify content gaps, prepare technical article/FAQ drafts, improve internal linking and flag outdated pages. Technical and standards-related updates should be reviewed before publication.

Technical FAQ DraftsProject questions converted into structured answers and FAQ topics.
Content Update SuggestionsIdentify pages that need clearer explanations, newer references or improved internal links.
Tender & Project TopicsCreate useful drafts around BOQ, design methods, applications and project planning.
SEO / AEO / GEO StructureSuggest headings, summaries, schema-ready FAQs and related technical page links.
Publishing control: AI-generated technical content is a draft workflow, not an automatic standards authority. Final technical claims, calculations and code references should be reviewed before going live.
BOTTOM TECHNICAL LIBRARY

IEC, NBC & Indian Standards / Guidelines

Click any box to open a separate full technical page. These pages explain the design role, scope, project inputs, calculations/limitations and how each standard connects to the Lightning Protection Design Studio.

Open Full Standards Library β†’
COMPLETE ENGINEERING WEBSITE

Lightning Protection Knowledge Centre

Open products, applications, engineering resources, tenders, city/state/district pages, calculators and technical content.

OPEN KNOWLEDGE CENTRE β†’

Buyer & Project Enquiry Guides

Use these focused guides for price, specification, application, BOQ and quotation requirements. Final engineering and selection are based on project/site data.

For quotation: send BOQ/specification, site location, quantity/capacity and application details to SN Engineering.

Lightning arrester and complete-system design consultation

Big construction projects: define the engineering deliverables

StageDeliverable to define in the consultancy scope
Design basisProject specification, soil data, equipment schedule, fault/protection inputs and agreed acceptance criteria.
Earthing designProposed earth-grid/electrode arrangement, conductor and connection schedule, bonding interfaces and test access.
Lightning protection designRisk/design basis, selected air-termination method, roof layout, down-conductor routing, bonding and earth-termination coordination.
BOQ and submittalsMaterial quantities, model datasheets, required evidence, drawings, deviations and clear installation exclusions.
Construction coordinationDrawing revisions, supports, civil-work interfaces, sequencing, inspection hold points and access arrangements.
Testing and handoverAgreed test methods, instrument records, measured results, defect closure, as-built drawings and maintenance schedule.

Confirm which calculations, drawings, site visits and revisions are included. A preliminary estimate or product recommendation is not an approved final design.

For PWD, MES, Air Force project contractors, railway and construction EPC teams, send the tender specification and roof/electrical drawings. Terminal selection must follow the accepted system approach and complete design requirements.

Government project documentation and UL verification Β· MES project consultation Β· Air Force infrastructure enquiries

Request design and BOQ reviewSend project enquiryCall +91 99906 45119

Lightning protection for Delhi NCR: a complete project scope

SN Engineering reviews lightning protection enquiries for Delhi, Gurugram/Gurgaon, Noida, Greater Noida, Ghaziabad, Faridabad and Manesar from its Gurgaon contact office. Use the design tool above for preliminary project planning, then submit drawings and specifications for an engineering and commercial review.

Start with the risk and project specification

A lightning risk assessment needs the structure's dimensions, location, use, occupancy, incoming services and consequences of damage. Confirm the required standard edition and customer specification before selecting a protection approach. The IEC 62305 series separates general principles, risk management, physical protection of structures and protection of electrical/electronic systems.

Conventional lightning protection system design

A conventional proposal should state the chosen air-termination method, protection level/design basis, down-conductor arrangement, earth termination, bonding and the protection of incoming services. Rolling-sphere, mesh and protective-angle methods have method-specific applicability; a preliminary visualisation is not a substitute for a reviewed project drawing.

ESE lightning arresters: compare the exact model and design basis

An ESE proposal should identify the model, declared Ξ”T, installation height, test documents and applicable ESE-specific requirements. Confirm customer acceptance and distinguish the ESE design basis from a conventional IEC 62305 proposal. Review the ESE selection and price checklist.

Components to identify in the quotation

ComponentSelection and quotation details
Air-termination systemConventional terminals, mesh or masts, or a specified ESE model where accepted by the project. Identify the design method, mounting arrangement and protected-zone drawing.
Down conductors and fittingsSpecify conductor material and dimensions, measured routes, supports, compatible connectors, guards and accessible test joints.
Earth termination and bondingDefine electrodes or ring/grid arrangement, connections, inspection points, material compatibility and the relationship to the existing earthing system.
Surge protectionIdentify the power and signal services requiring protection, SPD selection and coordination, installation locations and connection details.
Inspection and handoverState inspection scope, continuity and earth-testing records, equipment/calibration identification, as-built drawings and maintenance instructions.

Lightning protection installation and testing in Delhi NCR

Installation quotations should identify roof access, mounting supports, measured conductor routes, test joints, earth termination, bonding and any civil work. Agree inspections before concealed work is covered. Testing and handover should record the installed configuration, continuity and earth measurements, test-point identifiers and instrument details. Define maintenance inspections and checks after modifications or a suspected lightning event in the handover plan.

Testing and commissioning Β· Maintenance guide

Preparing a lightning protection BOQ and comparing prices

Separate air terminals, masts/supports, conductors, connectors, earth termination, bonding, SPDs, access equipment, installation, testing and documentation. State materials and measurable quantities against drawings. Confirm taxes, freight, civil work and installation responsibilities in the written quotation. Building area alone does not define the installed system price.

BOQ preparation guide Β· Lightning arrester buyer guide

Documents to check before order and at handover

Request the datasheet for the exact model offered, relevant test documents and a drawing showing the design basis. A test report for a different model, or a general company certificate, does not establish the performance of the proposed item.

For installation handover, agree dated site photographs linked to drawing references, conductor and bonding inspection records, test-point identifiers, the measurement method and instrument details, and as-built drawings. A preliminary design assessment is different from a signed record of completed installation and measured site results.

Buyer questions

Can one lightning arrester protect any building?

Selection requires the building dimensions, roof levels, equipment projections, design basis and protected-zone drawing. There is no universal coverage radius suitable for every project.

How is lightning arrester price worked out?

Compare the exact air-terminal model, mast/support arrangement, conductor material and quantity, earthing and bonding scope, SPDs, access equipment, installation, testing, taxes and freight. Request a written itemised quotation; model-only prices do not describe a complete installed system.

Which standard should the project use?

Confirm the edition and requirements named in the project specification. The IEC 62305 series addresses lightning protection and risk management; an ESE proposal should separately identify its ESE-specific design and test basis and the customer's acceptance requirements.

Delhi NCR project guides

Standards references

Review the project-specified edition and acceptance requirements. Official references: IEC 62305-2:2024 β€” risk management; IEC 62305-3:2024 β€” physical protection of structures; IEC 62305-4:2024 β€” electrical and electronic systems.

Request a Delhi NCR lightning protection quotation

Send the site location, roof plan/elevations, electrical single-line diagram, project specification, photographs and required supply/installation/testing scope. SN Engineering's contact office is DSS F-5, 1st Floor, Sector 10, Gurgaon, Haryana 122001. Project feasibility, visit arrangements, availability and schedule are confirmed during enquiry review.

Send project enquiry Β· +91 99906 45119 Β· WhatsApp enquiry

Lightning protection system price: compare the same scope

A terminal-only price cannot be compared directly with an installed system quotation. Request the same project scope from each supplier and ask for these costs separately.

Quotation lineInformation needed
Design and terminal selectionBuilding dimensions, roof plan, risk/design basis and accepted system approach.
System materialsAir terminals, supports, conductors, connections, bonding, earth termination and specified surge protection.
Installation and accessRoof access, work-at-height arrangements, conductor routes, civil work and exclusions.
Testing and handoverInspection scope, measured results, as-built drawings and maintenance requirements.

SN Engineering can review project enquiries for Delhi NCR and India. Price, service availability and execution schedule require confirmation against the supplied drawings and scope.

Prepare the earth-termination RFQ Β· Compare ESE model requirements

Send your BOQ and site details Β· Call +91 99906 45119