Tagline: IEC-compliant Lightning Protection, Chemical Earthing, Safe On Power Purifier & Dual-Fuel Generator Solutions.
Meta Title: SN Engineering | Lightning Protection Manufacturer, Supplier & Designer in Gurgaon (IEC 62305)
Meta Description: IEC 62305/62561-aligned Lightning Protection systems, Chemical Earthing Electrodes, SafeOn Power Purifier, Dual-Fuel Kits & PNG Generators. Manufacturer · Supplier · Designer based in Gurugram (Gurgaon), Delhi NCR. Call/WhatsApp +91 99906 45119.
We design, manufacture & install complete Lightning Protection and Earthing systems.
ESE & Conventional LPS, engineered earthing (GI/Cu/Cu-bonded), SPDs, SafeOn Power Purifier, Dual-Fuel/PNG generators.
Call / WhatsApp: +91 99906 45119 • +91 99582 12307
Email: earthingss@snengineering.com • sheel@snengineering.com
Location: Office 14, Nikhil Complex, Near Vedic Hospital & IOCL Pump, Sector 10, Gurugram 122001
Key Highlights: CPRI/NABL Tested • ISO 9001:2015 • IEC 62305/62561 • 10,000+ Installations • Rapid NCR Service
CPRI, NABL, PWD, MES, Airforce, ISO 9001:2015 (documentation support available).
Industrial parks • Data centers • Residential high-rise • Warehousing & logistics • Hospitals • Schools & colleges • Commercial complexes • Utilities.
Gurgaon (Gurugram), Delhi, Noida, Greater Noida, Faridabad, Manesar, Bhiwadi, Tapukara, Neemrana, Dharuhera, Rewari, Sonipat, Panipat — Pan-India on request.
Q1. Do you provide IEC 62305 risk analysis and site survey?
A. Yes. We conduct site surveys, soil coordination, IEC 62305-2 risk analysis, and deliver drawings + BOQ.
Q2. Can you supply both ESE and conventional LPS?
A. Yes. We design, supply, and install ESE systems and conventional air-termination networks with SPDs.
Q3. What sizes of earthing electrodes are available?
A. 50/80/100 mm in 2 m & 3 m (GI/Cu/Cu-bonded). BFC compound and full hardware available.
Q4. Do you offer installation & testing?
A. Yes. End-to-end installation, testing & commissioning with reports and optional AMC.
Q5. Can you size a Dual-Fuel/PNG generator?
A. Yes. Share your load details and duty cycle; we’ll propose a right-sized solution and savings estimate.
Phone / WhatsApp: +91 99906 45119 • +91 99582 12307
Email: earthingss@snengineering.com • sheel@snengineering.com
Address: Office 14, Nikhil Complex, Near Vedic Hospital & IOCL Pump, Sector 10, Gurugram 122001
Hours: Mon–Sat 9:30–18:30 IST
Quick WhatsApp Link (paste in button):
https://wa.me/919990645119?text=Hello%20SN%20Engineering%2C%20please%20call%20me%20for%20Lightning%20Protection%20%2F%20Earthing%20site%20visit.
Manufacturer · Supplier · Installer | Gurgaon · Delhi NCR
Meta Title: Chemical Earthing in Gurgaon | SN Engineering – Earthing Electrodes, BFC Compound, Earthing Services
Meta Description: SN Engineering offers high-quality chemical earthing systems (GI/Cu/Cu-Bonded electrodes, BFC back-fill, pit covers) in Gurgaon & Delhi NCR. CPRI/NABL tested, turnkey installation. Call +91 99906 45119.
In India’s diverse soil conditions—especially in Gurgaon and the Delhi NCR region—conventional earthing often fails to achieve low resistance and long-term stability. Chemical earthing systems offer:
As a specialist in lightning protection & earthing, SN Engineering provides engineered chemical earthing solutions designed to reduce ground resistance, simplify inspection & maintenance, and integrate seamlessly with LPS systems.
Q. What ground resistance value can you achieve?
A. In typical Gurgaon soil we achieve sub-2 Ω values for standard electrodes; with copper-bonded rods + BFC we frequently achieve <1 Ω in optimal conditions.
Q. How long do copper-bonded electrodes last?
A. With proper installation and BFC use, the expected lifespan is 20-25 years with minimal maintenance.
Q. Can you integrate the earthing with our lightning protection system?
A. Yes. Our design always coordinates earthing and lightning down-conductors for a common, low-impedance network, and we provide as-built drawings.
Q. Do you perform retesting after 1 year?
A. Yes. We offer AMC with annual earth-resistance tests, visual inspection of pit covers and re-commissioning.
Q. What’s the usual lead time for supply & installation?
A. For standard electrodes and BFC stock we typically deliver in 10-14 days in Gurgaon; installation lead may vary by site size and access.
Phone / WhatsApp: +91 99906 45119 • +91 99582 12307
Email: earthingss@snengineering.com • sheel@snengineering.com
Location: Office 14, Nikhil Complex, Near Vedic Hospital & IOCL Pump, Sector 10, Gurugram 122001
→ Send WhatsApp Message
Meta Title: Dual Fuel Kit & PNG Gas Generator Supplier in Gurgaon, Manesar, Bhiwadi & Bawal | SN Engineering
Meta Description: SN Engineering supplies and installs dual-fuel conversion kits and PNG gas generators (30 kVA-2000 kVA) in Gurgaon, Manesar, Bhiwadi, Bawal, Neemrana and Delhi NCR. Reduce fuel cost, emissions & comply with regulations. Call +91 99906 45119.
With increasing fuel costs, stricter environmental regulations (e.g., Commission for Air Quality Management-CAQM directives in NCR) and the push for cleaner power solutions, converting your diesel generator to a dual-fuel system or moving to a PNG gas generator makes strong technical & economic sense. gastech-systems.com+2Fuelflip Energy+2
Key benefits include:
We actively serve:
Q. What fuel savings can I expect with a dual fuel kit?
A. Depending on gas availability and load profile, reductions of 40-70% in diesel use are typical. Systems like those described by GasTech Systems show up to ~70%. gastech-systems.com
Q. How does dual fuel conversion impact existing generator warranty?
A. It depends—some OEMs accept conversion if installed per their guidelines. We provide documentation and manufacturer compatibility to facilitate this.
Q. Can I retrofit on any brand of generator?
A. Yes—our system supports major brands. We evaluate engine compatibility, control system integration, gas supply and site conditions (as referenced in conversion kits). palsvam.com+1
Q. What about site gas-supply logistics in Manesar/Bhiwadi?
A. We coordinate with gas utilities, ensure gas connection (PNG/CNG) feasibility, pressure regulation, piping & safety. If gas supply is not feasible we advise alternative configurations.
Q. What lead-time for retrofit/installation?
A. Typically 4-8 weeks from order for dual fuel kit + installation (site inspection, gas piping, commissioning). Variations depend on site readiness and approvals.
Phone / WhatsApp: +91 99906 45119 • +91 99582 12307
Email: earthingss@snengineering.com • sheel@snengineering.com
Address: Office 14, Nikhil Complex, Near Vedic Hospital & IOCL Pump, Sector 10, Gurugram 122001
👉 Click to WhatsApp